Date

Main Contractor

Contracting party

Project description

Object

2014-2017
RZD International – Belgrade branch
Institute “Mihajlo Pupin”
Delivery of equipment and execution of works on securing SS and TT systems and connections for the “Second railway track on the section Pančevački most – Pančevo Glavna (km 4 + 742 – km 19 + 600, length 14 858 m) within the railway Belgrade Centar – Pančevo Glavna – Vršac – state border between Serbia and Romania”
Pančevački most – Pančevo main (from km 4+742 to km 19+600)
2017-2020
CCECC
Institute “Mihajlo Pupin”
Renovation with major repairs of the Rasputnica “G” – Rakovica – Resnik railway section from km 7+126 to km 14+554 (L=7428m) on the railway Belgrade – Mladenovac – Niš – Preševo ​​- state border
JUNCTION G – RAKOVICA – RESNIK
2019.
Energoprojekt
Institute “Mihajlo Pupin”
Execution of works on the construction of the public railway line from the existing Smederevo-Mala Krsna line to the bulk and general cargo terminal Port of Smederevo – construction – assembly works on SS facilities
Smederevo – Mala Krsna
2019.
JV CRIC & CCCC – CRSC
Institute “Mihajlo Pupin”
The project of modernization and reconstruction of the Hungarian-Serbian railway connection on the territory of the Republic of Serbia, section Belgrade Center – Stara Pazova – temporary solution for the railway station Novi Beograd
Railway station Novi Beograd
2019.
JV CRIC & CCCC – CRSC
Institute “Mihajlo Pupin”
The project of modernization and reconstruction of the Hungarian-Serbian railway connection on the territory of the Republic of Serbia, section Belgrade Center – Stara Pazova – temporary solution for the railway station Zemun
Railway station Zemun
2021.
JV CRIC & CCCC – CRSC
CRSC International Co. Ltd. Serbia – ogranak Beograd
Construction works and installation materials for telecommunications & signaling for the Stara Pazova station (exclusively) — Beška (inclusively) – work on underpasses, optical cables, STA cables – collisions, transponders,
Stara Pazova – Beška
2021.
JV CRIC & CCCC – CRSC
CRSC International Co. Ltd. Serbia – ogranak Beograd
Construction works and telecommunication installations
Location: COLLISION 5 AND 6
Zemun polje – Stara Pazova
2022.
JV CRIC & CCCC – CRSC
China Railway International Co. Ltd. Serbia-ogranak Beograd
Construction works and telecommunication installations
Location: COLLISION 10 AND 11 – FROM km 34+675.08 (Novi Sad left track) to km 34+884.45 (Novi Sad left track) of the railway line, entering Stara Pazova station
Stara Pazova
2022.
JV CRIC & CCCC – CRSC
China Railway International Co. Ltd. Serbia-ogranak Beograd
Execution of construction works and installations on signaling and telecommunications
Location: interstation distance Batajnica – Nova Pazova, Nova Pazova – Stara Pazova, Zemunsko polje – Batajnica
Zemun polje – Stara Pazova
2019-2022
JV CRIC & CCCC – CRSC
Institute “Mihajlo Pupin”
Phased works on signaling and telecommunications of the railway line between Zemun (exclusively) – Stara Pazova (inclusively) Section and relocation of telecommunication cables for Belgrade Center (exclusively) – Stara Pazova (inclusively)
Beograd Centar – Stara Pazova
2020-2022
JV CRIC & CCCC – CRSC
Institute “Mihajlo Pupin”
Construction works and installation materials for telecommunications & signaling for Batajnica station (exclusively) — Stara Pazova station (inclusively) – Final insurance
Batajnica – Stara Pazova
2020-
Energoprojekt
Institute “Mihajlo Pupin”
Works on the SS and TT systems for the modernization of the technical-passenger railway station Zemun
TPS Zemun
2018-2021
RZD International – Belgrade branch
ATM BG d.o.o.
Construction – assembly works on relocation and protection of telecommunication networks on the Object “Reconstruction, modernization and construction of the double-track railway Belgrade – Stara Pazova – Novi Sad – Subotica – State border (length 40.44), section Stara Pazova – Novi Sad”
– telecom collisions, cable sewerage, TK shafts
Stara Pazova – Novi Sad
2018-2021
RZD International – Belgrade branch
ATM BG d.o.o.
Works on cable routes on the route Inđija – Novi Sad – installation of channels
Inđija – Novi Sad
2019-2021
RZD International – Belgrade branch
ATM BG d.o.o.
Construction – assembly works on relocation and protection of telecommunication networks on the Object “Reconstruction, modernization and construction of the double-track railway Belgrade – Stara Pazova – Novi Sad – Subotica – State border (length 40.44), section Stara Pazova – Novi Sad”
– railway collisions, underpasses, dismantling
Stara Pazova – Novi Sad
2019-2021
RZD International – Belgrade branch
ATM BG d.o.o.
Works on signal security devices and works, telecommunication devices, relocation and protection of cables, TK systems in terminal facilities
Ranžirna stanica Makiš, Beograd
2021-2022
RZD International – Belgrade branch
ATM BG d.o.o.
Reconstruction, modernization and construction of the double-track railway Belgrade – Stara Pazova – Novi Sad – Subotica – State border (length 40, 44), section Stara Pazova – Novi Sad” – Phase 2 – works on
– cable sewerage, TK shafts, cable routes, construction of lighting and foundation construction
Stara Pazova – Novi Sad
2021-2022
RZD International – Belgrade branch
ATM BG d.o.o.
Works on cable routes on the route Stara Pazova – Inđija – Golubinci with Šid tracks
Stara Pazova – Inđija – Golubinci
2021-2022
RZD International – Belgrade branch
ATM BG d.o.o.
Local management of motor-driven disconnectors for the Object “Reconstruction, modernization and construction of the double-track railway Belgrade – Stara Pazova – Novi Sad – Subotica – State border (length 40.44), section Stara Pazova – Novi Sad” – Phase 2
Inđija – Inđija Pustara – Beška – Čortanovci entrance – Čortanovnci exit – Karlovački Vinogradi – Sremski Karlovci – Petrovaradin
2020 – 2021.
Serbian Railways Infrastructure a.d
Serbian Railways Infrastructure a.d
Construction – assembly works on cable infrastructure
Smederevo – Mala Krsna, Vranovo – Radinac, Beograd ranžirna A, Rakovica
2020.
RZD International – Belgrade branch
Ingrap Omni d.o.o.
Electric and TK works along the water supply km 41+524
Inđija
2020.
RZD International – Belgrade branch
Ingrap Omni d.o.o.
Additional works on collision 1 – Displacement and protection of SS and TT cables
Inđija
2018.
RZD International – Belgrade branch
RZD International – Belgrade branch
Execution of a complex of construction and installation works on the laying of a cable line for the supply of electricity 20 kV for connection to substations MBTS EV-41 20/1/0.4 kV TS1 “Čortanovci”, MBTS EV-41 20/0.4 kV TS2 “Čortanovci “, MBTS EV-21 20/0.4 kV TS3 “Čortanovci” and providing the construction site of the “Čortanovci” tunnel and the viaduct in km 59+159.40 with the necessary amount of electricity used on the Object “Construction of the viaduct in km 59+159, 40 and the tunnel “Čortanovci” on the section Stara Pazova – Novi Sad, as part of the reconstruction, modernization and construction of the double-track railway Belgrade – Stara Pazova – Novi Sad – Subotica – State border”
Čortanovci
2020.
Hitachi
Termoelektro d.o.o.
Relocation of optical, telephone and railway cables in TENT A Obrenovac
Tent A, Obrenovac
2021.
Strabag
Strabag d.o.o.
Construction of an intermodal terminal in Batajnica (Belgrade), relocation, continuation of the existing installation and protection of SS cables
Beograd
2022.
JV CRIC & CCCC – CRSC
Signaling doo
HotBox systems on the Belgrade – Subotica railway
Beška – Petrovaradin