Date |
Main Contractor |
Contracting party |
Project description |
Object |
2014-2017 |
RZD International – Belgrade branch |
Institute “Mihajlo Pupin” |
Delivery of equipment and execution of works on securing SS and TT systems and connections for the “Second railway track on the section Pančevački most – Pančevo Glavna (km 4 + 742 – km 19 + 600, length 14 858 m) within the railway Belgrade Centar – Pančevo Glavna – Vršac – state border between Serbia and Romania” |
Pančevački most – Pančevo main (from km 4+742 to km 19+600) |
2017-2020 |
CCECC |
Institute “Mihajlo Pupin” |
Renovation with major repairs of the Rasputnica “G” – Rakovica – Resnik railway section from km 7+126 to km 14+554 (L=7428m) on the railway Belgrade – Mladenovac – Niš – Preševo - state border |
JUNCTION G – RAKOVICA – RESNIK |
2019. |
Energoprojekt |
Institute “Mihajlo Pupin” |
Execution of works on the construction of the public railway line from the existing Smederevo-Mala Krsna line to the bulk and general cargo terminal Port of Smederevo – construction – assembly works on SS facilities |
Smederevo – Mala Krsna |
2019. |
JV CRIC & CCCC – CRSC |
Institute “Mihajlo Pupin” |
The project of modernization and reconstruction of the Hungarian-Serbian railway connection on the territory of the Republic of Serbia, section Belgrade Center – Stara Pazova – temporary solution for the railway station Novi Beograd |
Railway station Novi Beograd |
2019. |
JV CRIC & CCCC – CRSC |
Institute “Mihajlo Pupin” |
The project of modernization and reconstruction of the Hungarian-Serbian railway connection on the territory of the Republic of Serbia, section Belgrade Center – Stara Pazova – temporary solution for the railway station Zemun |
Railway station Zemun |
2021. |
JV CRIC & CCCC – CRSC |
CRSC International Co. Ltd. Serbia – ogranak Beograd |
Construction works and installation materials for telecommunications & signaling for the Stara Pazova station (exclusively) — Beška (inclusively) – work on underpasses, optical cables, STA cables – collisions, transponders, |
Stara Pazova – Beška |
2021. |
JV CRIC & CCCC – CRSC |
CRSC International Co. Ltd. Serbia – ogranak Beograd |
Construction works and telecommunication installations Location: COLLISION 5 AND 6 |
Zemun polje – Stara Pazova |
2022. |
JV CRIC & CCCC – CRSC |
China Railway International Co. Ltd. Serbia-ogranak Beograd |
Construction works and telecommunication installations Location: COLLISION 10 AND 11 – FROM km 34+675.08 (Novi Sad left track) to km 34+884.45 (Novi Sad left track) of the railway line, entering Stara Pazova station |
Stara Pazova |
2022. |
JV CRIC & CCCC – CRSC |
China Railway International Co. Ltd. Serbia-ogranak Beograd |
Execution of construction works and installations on signaling and telecommunications Location: interstation distance Batajnica – Nova Pazova, Nova Pazova – Stara Pazova, Zemunsko polje – Batajnica |
Zemun polje – Stara Pazova |
2019-2022 |
JV CRIC & CCCC – CRSC |
Institute “Mihajlo Pupin” |
Phased works on signaling and telecommunications of the railway line between Zemun (exclusively) – Stara Pazova (inclusively) Section and relocation of telecommunication cables for Belgrade Center (exclusively) – Stara Pazova (inclusively) |
Beograd Centar – Stara Pazova |
2020-2022 |
JV CRIC & CCCC – CRSC |
Institute “Mihajlo Pupin” |
Construction works and installation materials for telecommunications & signaling for Batajnica station (exclusively) — Stara Pazova station (inclusively) – Final insurance |
Batajnica – Stara Pazova |
2020- |
Energoprojekt |
Institute “Mihajlo Pupin” |
Works on the SS and TT systems for the modernization of the technical-passenger railway station Zemun |
TPS Zemun |
2018-2021 |
RZD International – Belgrade branch |
ATM BG d.o.o. |
Construction – assembly works on relocation and protection of telecommunication networks on the Object “Reconstruction, modernization and construction of the double-track railway Belgrade – Stara Pazova – Novi Sad – Subotica – State border (length 40.44), section Stara Pazova – Novi Sad” – telecom collisions, cable sewerage, TK shafts |
Stara Pazova – Novi Sad |
2018-2021 |
RZD International – Belgrade branch |
ATM BG d.o.o. |
Works on cable routes on the route Inđija – Novi Sad – installation of channels |
Inđija – Novi Sad |
2019-2021 |
RZD International – Belgrade branch |
ATM BG d.o.o. |
Construction – assembly works on relocation and protection of telecommunication networks on the Object “Reconstruction, modernization and construction of the double-track railway Belgrade – Stara Pazova – Novi Sad – Subotica – State border (length 40.44), section Stara Pazova – Novi Sad” – railway collisions, underpasses, dismantling |
Stara Pazova – Novi Sad |
2019-2021 |
RZD International – Belgrade branch |
ATM BG d.o.o. |
Works on signal security devices and works, telecommunication devices, relocation and protection of cables, TK systems in terminal facilities |
Ranžirna stanica Makiš, Beograd |
2021-2022 |
RZD International – Belgrade branch |
ATM BG d.o.o. |
Reconstruction, modernization and construction of the double-track railway Belgrade – Stara Pazova – Novi Sad – Subotica – State border (length 40, 44), section Stara Pazova – Novi Sad” – Phase 2 – works on – cable sewerage, TK shafts, cable routes, construction of lighting and foundation construction |
Stara Pazova – Novi Sad |
2021-2022 |
RZD International – Belgrade branch |
ATM BG d.o.o. |
Works on cable routes on the route Stara Pazova – Inđija – Golubinci with Šid tracks |
Stara Pazova – Inđija – Golubinci |
2021-2022 |
RZD International – Belgrade branch |
ATM BG d.o.o. |
Local management of motor-driven disconnectors for the Object “Reconstruction, modernization and construction of the double-track railway Belgrade – Stara Pazova – Novi Sad – Subotica – State border (length 40.44), section Stara Pazova – Novi Sad” – Phase 2 |
Inđija – Inđija Pustara – Beška – Čortanovci entrance – Čortanovnci exit – Karlovački Vinogradi – Sremski Karlovci – Petrovaradin |
2020 – 2021. |
Serbian Railways Infrastructure a.d |
Serbian Railways Infrastructure a.d |
Construction – assembly works on cable infrastructure |
Smederevo – Mala Krsna, Vranovo – Radinac, Beograd ranžirna A, Rakovica |
2020. |
RZD International – Belgrade branch |
Ingrap Omni d.o.o. |
Electric and TK works along the water supply km 41+524 |
Inđija |
2020. |
RZD International – Belgrade branch |
Ingrap Omni d.o.o. |
Additional works on collision 1 – Displacement and protection of SS and TT cables |
Inđija |
2018. |
RZD International – Belgrade branch |
RZD International – Belgrade branch |
Execution of a complex of construction and installation works on the laying of a cable line for the supply of electricity 20 kV for connection to substations MBTS EV-41 20/1/0.4 kV TS1 “Čortanovci”, MBTS EV-41 20/0.4 kV TS2 “Čortanovci “, MBTS EV-21 20/0.4 kV TS3 “Čortanovci” and providing the construction site of the “Čortanovci” tunnel and the viaduct in km 59+159.40 with the necessary amount of electricity used on the Object “Construction of the viaduct in km 59+159, 40 and the tunnel “Čortanovci” on the section Stara Pazova – Novi Sad, as part of the reconstruction, modernization and construction of the double-track railway Belgrade – Stara Pazova – Novi Sad – Subotica – State border” |
Čortanovci |
2020. |
Hitachi |
Termoelektro d.o.o. |
Relocation of optical, telephone and railway cables in TENT A Obrenovac |
Tent A, Obrenovac |
2021. |
Strabag |
Strabag d.o.o. |
Construction of an intermodal terminal in Batajnica (Belgrade), relocation, continuation of the existing installation and protection of SS cables |
Beograd |
2022. |
JV CRIC & CCCC – CRSC |
Signaling doo |
HotBox systems on the Belgrade – Subotica railway |
Beška – Petrovaradin |